control performance for a Process plant-repost

Geschlossen Veröffentlicht Mar 18, 2013 Bezahlt bei Lieferung
Geschlossen Bezahlt bei Lieferung

The MVC-benchmark has been used to obtain an optimal benchmark and this can be use to assess process plant. The objective is not just minimizing process output variance but also keeping the input variability within some specified range to reduce upset to other processes, conserve energy and lessen the equipment wear.

Matlab und Mathematica

Projekt-ID: #4343753

Über das Projekt

3 Vorschläge Remote Projekt Aktiv Apr 24, 2013

3 Freelancer bieten im Durchschnitt $433 für diesen Job

bchandra1955

Professional engineer from controls domain here

$550 USD in 18 Tagen
(22 Bewertungen)
4.7
alncr

I'm at your service. Let's discuss and get it done quickly.

$250 USD in 4 Tagen
(1 Bewertung)
2.0
betaenergy

Dear Sir, We are Reserach and Development company whose working area are : -Digital Motor Control -Analog Design -Electronic Design -Power Electronics -PCB design -Embedded system -Matlab -Simulation of ha Mehr

$600 USD in 14 Tagen
(3 Bewertungen)
0.0
kannad

Hi. I have extensive experience (not to mention, a PhD) in optimal control system design and Matlab/Simulink.

$500 USD in 6 Tagen
(0 Bewertungen)
0.0