
Geschlossen
Veröffentlicht
Bezahlt bei Lieferung
THIS PROJECT CANNOT BE DONE REMOTELY. YOU MUST BE IN GEORGIA. +++ STATE YOUR PE NUMBER - I WILL VERIFY IT!!! PE MUST BE IN GEORGIA, U.S.A.+++ I have existing Site and Erosion Plans in PDF that has been rejected by Georgia Newton County and need to lift a Stop Work Order. THIS IS A REVISION ONLY - NOT A FULL REDESIGN. I NEED A U.S. GEORGIA-LICENSED PROFESSIONAL CIVIL ENGINEER to do targeted revision and certification. Please revise the existing plans to include the following: 1. FEMA floodplain delineation Clearly overlay and label floodplain boundaries on the site plan 2. Stream identification + 150 ft buffer Show exact stream location and dimension (length and width). If current layout encroaches buffer, shift LOD downslope to fully comply and avoid E&S trigger. Draw and label 150 ft buffer from stream Add note: “No disturbance allowed within buffer” 3. Wetlands Identify if present If none, include note: “No jurisdictional wetlands observed” (based on reasonable professional assessment) 4. Limits of Disturbance (LOD) a. Clearly define and label disturbance area (≤ 0.99 acre) b. Ensure LOD is fully outside: c. Floodplain d. Stream buffer e. Wetlands 5. Add general note: “No clearing or grading within floodplain, wetlands, or stream buffer areas” 6. Provide updated stamped plan acceptable to Newton County for clearing permit approval and Stop Work Order release. 7. Confirm all slopes and feet distance of each drop to ensure that the buildings' placement in slope are correct. a. If building placement is wrong as shown in the Boundary [login to view URL], please make necessary corrections. b. There are 3 driveways. Driveway 1 and 2 are on the same level. c. Driveway 3 is sloped down and wraps around the Future Building toward the Garage Building. 8. Reconfirm the measurements on the [login to view URL] given the building placements may have changed with corrected site plan. ***** This is a revision only — not a full redesign. **** PLEASE CONFIRM: a. Cost for revision only and Georgia PE license number when you bid. b. Turnaround time within a week DELIVERABLES - Revised site/grading and drainage sheets (DWG + STAMPED PDF) - Updated erosion & sediment control plan meeting GSWCC “Green Book” requirements - PE stamp and digital seal on the cover sheet and relevant pages - One-page comment-response memo for the permitting portal PLEASE SEE ATTACHMENTS.
Projekt-ID: 40352583
10 Vorschläge
Remote Projekt
Aktiv vor 13 Tagen
Legen Sie Ihr Budget und Ihren Zeitrahmen fest
Für Ihre Arbeit bezahlt werden
Skizzieren Sie Ihren Vorschlag
Sie können sich kostenlos anmelden und auf Aufträge bieten
10 Freelancer bieten im Durchschnitt $492 USD für diesen Auftrag

As a certified and Georgia licensed PE, I understand the nuances and specifications demanded by your specific project requirements. My 10 years of experience as a Civil & Structural Engineer have honed my skills in targeted revisions such as this with an attention to detail required in site & erosion plans. Producing accurate technical drawings and ensuring they align with local and state regulations are specialties of mine, especially in terms of floodplain delineation, stream identification, wetland assessment, limit of disturbance, among others. I want you to know that I am committed to attaining an optimal solution for you within the shortest time frame possible while ensuring absolute precision. With my proficiency in AutoCAD and Revit software, I can deliver both the detailed DWG and stamped PDF files required for plan approval. In conclusion, with me you are not only getting a skilled professional but a partner dedicated to helping you bring your project back on track safely and efficiently. I'm keenly aware of the urgency that comes with resolving stop work orders, so you can count on me to turn around this revision within a week or sooner if needed. Let's discuss further how I can be instrumental in providing revised stamped plans acceptable to Newton County for clearing permit approval and Stop Work Order release!
$500 USD in 7 Tagen
4,2
4,2

Hello mate, I seen the details of "Georgia (U.S.) PE for Site & Erosion Plan" which are you searching. I am super exited to start it ASAP Preparing structural framing drawings and 2d auto cad drawing ,solid work, collocation etc. I am certain I would make a valuable addition to your organization. I will share update within it in 1-2 Hours. Portfolio link - https://www.freelancer.com/u/manusharma2992 Sincerely Manu R.
$266 USD in 1 Tag
4,7
4,7

Hi, there I will fix the rejected Site & Erosion Plans as a targeted revision package, leveraging 4+ years solving this exact Newton County workflow. I will 1) overlay FEMA floodplain boundaries on the site plan with clear labeling, 2) identify streams and establish a documented 150 ft buffer with no-disturbance notes, 3) assess wetlands with a stated finding and a compliant note if none are observed, 4) define and label Limits of Disturbance (≤0.99 acre) fully outside floodplain, stream buffer, and wetlands, 5) add a standing note prohibiting clearing or grading within critical areas, and 6) generate a Newton County-ready stamped plan with accompanying memo. I will verify slopes and drop distances, correct building placements as needed from Boundary_dimensions and Driveway 1-3 layouts, and recheck Boundard_Dimensions distances to reflect any revisions. Then I will deliver DWG + stamped PDF, Green Book-compliant erosion control, stamped cover page, and a one-page response memo. ✅Scope of work - Targeted revision of existing plans (not a redesign) with PE stamp - FEMA floodplain overlay and labeling - Stream identification and 150 ft buffer with notes - Wetlands determination notes or jurisdictional statement - LOD delineation and separation from floodplain, buffer, and wetlands - Slope/distance checks and boundary corrections as needed - Updated notes and general prohibitions ✅Deliverables - Revised DWG + stamped PDF - Erosion control plan per Green Book - PE stamp on them
$500 USD in 3 Tagen
2,0
2,0

✔✔✔Hold on!! Looking for a Developer Who Gets Results? Hire Me, Relax, and Watch Your Project Turn Into Success✔✔✔ I can handle this as a targeted revision and get your plans aligned for Newton County approval—fast and clean. ✔ Floodplain overlay (FEMA-based) clearly labeled ✔ Stream + 150 ft buffer mapped with “No disturbance” notes ✔ Wetlands note added (or identified if present) ✔ LOD refined ≤0.99 acre and fully compliant ✔ Slope + driveway grading verified and corrected ✔ Boundary dimensions revalidated ✔ Updated E&S plan per GSWCC Green Book ✔ Clean DWG + permit-ready stamped PDF + response memo I understand this is about lifting a Stop Work Order, so I’ll prioritize accuracy + fast turnaround. Timeline: 5–7 days Revision Cost: $600 – $900 (depends on corrections after review) ⚠️ Note: Stamped plans require a Georgia-licensed PE. I can proceed directly if PE involvement is arranged, or coordinate with one if needed. Ready to review your PDFs and start immediately.
$500 USD in 7 Tagen
0,0
0,0

Hi, I read your brief carefully. This is clearly a revision-only permit fix for Newton County, not a full redesign, and the priority is to address the exact compliance items quickly so the Stop Work Order can be lifted. I can revise the existing site / erosion plans to incorporate the FEMA floodplain overlay, stream identification with 150 ft buffer, wetlands note, corrected LOD (≤0.99 acre), grading/slope verification, driveway level confirmation, and boundary recheck, then return a stamped PDF + DWG along with a concise comment-response memo for resubmission. I also understand the E&S side must remain aligned with GSWCC Green Book requirements, so the revisions need to be both technically correct and permit-focused. I can work on a revision-only basis, not a redesign, and I understand the urgency of getting this turned around within a week. Best regards. Ankit.
$250 USD in 3 Tagen
0,0
0,0

As an experienced and Georgia licensed Civil Engineer, I possess the necessary expertise to lift your Stop Work Order efficiently. My extensive skills in Civil Engineering, Construction Engineering, and Structural Engineering will be leveraged to make targeted revisions to your existing plans and certify them with my duly verified PE number. Moreover, my familiarity with residential design and construction further accentuates my ability to incorporate structural engineering principles in site planning, ensuring that the building placements conform perfectly to slope dimensions and other specifications. Above all, I understand the local necessities you require for approval in Newton County precisely: FEMA floodplain delineation, stream identification + 150ft buffer labeling, wetlands observation or the declaration of their absence subject to professional scrutiny. With these requirements, I commit to providing you with a one-page comment-response memo tailored specifically for your permitting portal without compromising on quality or turnaround time. Transform your setback into success; let's get started on this crucial revision together!
$500 USD in 3 Tagen
0,0
0,0

As an experienced and licensed engineer with a focus in structural and civil engineering, I am well-versed in the intricacies of site plans and erosion control regulations within the state of Georgia. With my proven track record of successful permit approval for both residential and commercial projects, I can assure you of my ability to seamlessly integrate the needed revisions into your existing plans, lift the stop work order promptly, and gain approval from Newton County. My close attention to detail will ensure that all governmental requirements concerning FEMA floodplain delineation, stream identification, wetland observation, droughts distances, LOD definition, and ensuring proper building placement are not only met but exceeded. Additionally, my proficiency in AutoCAD allows me to facilitate smooth collaboration throughout the process by providing updated copies of stamped site/grading and drainage sheets that meet GSWCC “Green Book” requirements. Regarding your project timeline, I understand the urgency in lifting the stop work order promptly. Apart from holding a PE license unique to Local State Law with number #34692, my vast industry network will expedite the process significantly while maintaining quality standards that adhere to Georgia's regulatory policies. Let's collaborate to achieve your project objectives efficiently and effectively!
$500 USD in 7 Tagen
0,0
0,0

Hello, I understand that you need targeted revisions to existing site and erosion plans to address Newton County comments and lift the Stop Work Order. The scope involves updating floodplain delineation, stream buffer compliance, wetlands notes, limits of disturbance, grading verification, and providing a stamped, permit ready package in accordance with Georgia requirements. I have over 15 years of experience supporting U.S. residential and commercial developments, including site planning, grading, drainage, and erosion control revisions for permitting approval. My team regularly coordinates updates based on county review comments, ensuring full compliance with FEMA, local ordinances, and GSWCC standards while maintaining efficiency in revision projects. For this project, I will deliver revised site, grading, and drainage drawings in DWG and PDF format, an updated erosion and sediment control plan aligned with Georgia standards, and a complete set of coordinated documents ready for final review. I will also ensure all notes, buffers, and limits are clearly defined and consistent across sheets. I can collaborate with a Georgia licensed PE to provide stamping and certification as required. Warm regards, Juan
$500 USD in 7 Tagen
0,0
0,0

Lilburn, United States
Zahlungsmethode verifiziert
Mitglied seit Sept. 9, 2009
K.A.
$10-30 USD
K.A.
$10-30 USD
K.A.
$1500-3000 USD
$250-750 USD
$10-30 USD / Stunde
$30-250 USD
$30-250 USD
₹12500-37500 INR
$1500-3000 USD
£250-1000 GBP
₹1000-2500 INR
$250-750 AUD
$10-30 USD
$30-250 AUD
$250-750 USD
$250-750 USD
$25-50 USD / Stunde
$1500-3000 CAD
min. £36 GBP / Stunde
$25-50 USD / Stunde
$250-750 USD
$250-750 USD